Size | 5800*1500*1800m (or customized size) |
Steel structure | Galvanized steel frame+steel plate |
MOQ | 1 set |
Equipment: | Equipment room, filtration and circulation system, disinfection system, seven color lights, stairs, power box, distribution box, drainage, and leakage protection |
Optional | glass, wave building system, heating system, jacuzzi, shallow water platform, railing, bathroom, sink |
Advantages:
Firstly, container swimming pools have the characteristics of rapid construction and mobility. Through reasonable design and combination, the construction of the swimming pool can be completed in a relatively short time to meet the seasonal needs of the scenic area. At the same time, the mobility of containers also allows the swimming pool to be flexibly relocated according to needs, better adapting to the layout of different scenic spots.
Secondly, the design and functionality of the container swimming pool are perfectly integrated. The sturdy structure and spacious interior space of the container ensure the safety and comfort of the swimming pool. Meanwhile, designers can create creative decorations based on the theme and characteristics of the scenic area, creating a unique swimming pool environment that allows tourists to enjoy the beautiful scenery while swimming.
In addition, container swimming pools also have economic and environmental advantages. Compared to the construction of traditional swimming pools, container swimming pools have lower costs and shorter construction cycles, reducing the occupation and impact on the scenic area.
Details:
Packing:
1. What are your prices?
Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
2.Do you have a minimum order quantity?
One set is our minimum order quantity.
3.Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
4.What is the average lead time?
The lead time is about 40 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
5.What kinds of payment methods do you accept?
You can make the payment to our bank account, Alipay: 30% deposit in advance, 70% balance against the copy of PI.